Mould

OEM Custom Injection Plastic Automotive Tail Lamp Mould

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.
  • Plastic Material:PC
  • Mould Cavity:Multi Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Application:Car
  • Runner:Hot Runner

Base Info

  • T1 Sample Time:45-60 Days
  • Offer You:OEM&ODM Service
  • Runner System:Hot,Cold Runner
  • Mould Standard:Dme,Hasco,Lkm
  • Mould Operating Mode:Automatically by CNC
  • Mould Quality Control:Professional QC
  • Mould Base:S50c
  • Mould Design Software:Ug,Proe,Solidworks CAD,etc
  • Size:According to Customers Requirement
  • Mould Runner System:Hot Runner or Cold
  • Customized:Customized
  • Standard:DME
  • Certification:ISO
  • Installation:Fixed
  • Design Software:AutoCAD
  • Model NO.:JSL-N0717-11
  • Transport Package:High Quality Wooden Case
  • Specification:DME, HASCO, LKM, etc
  • Trademark:JSLMOULD
  • Origin:Taizhou, China
  • HS Code:8480719090
  • Production Capacity:400 Sets Molds,Year

Description

Our Advantage     1.High quality     2.Reasonable price     3.On time delivery     4.Good After-sale service     5.Strict quality control     6.All the mould are automotic.
 
 Offer youIn-time response on letters, telephone calls or faxIn-time supply the quotation and mould designsIn-time communication on the technical pointsIn-time sending pictures for the mould machining progress and mould finishing scheduleIn-time mould test and sample deliveryIn-time mould delivery.
Auto Lamp Mould1.Samples/Drawing &Requirement from you2.Mould design:we will Communicate&Exchange the opinion with you after you place order.3.Material Purchase:Steel cutting and Mould base tooling.4.Assembling.5.Inspection of mould : following and controlling the tooling processing.6.Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you!7.Your instruction &confirmation for shipment.8.Ready made mould before packing.
 
 For more information please contact us.
Main QC Procedure
mould design control
mould steel certificated
mould steel hardness inspection
mould steel electrodes inspection
mould core and cavity steel dimension inspeciton
mould pre assembly inspection
mould trial report and sample inspection
mould pre shipment trial inspection
export mould package inspection.

FAQ:
 
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.

2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.

4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.OEM Custom Injection Plastic Automotive Tail Lamp Mould