Mould

Professional Premium 100 L Swing Lid Plastic Waste Bin Mold

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.
  • Plastic Material:PP
  • Mould Cavity:Single Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Process Combination Type:Single-Process Mode
  • Application:Home Use

Base Info

  • Mould Report:7-10days Per Time
  • Design:7days
  • Mould Operating Mode:Automatically
  • Mach Equipment:CNC,EDM,Wire Cutting Machine,Drilling,Grinding
  • Mould Quality Control:by Professional QC
  • Mould Cooling System:by Experienced Designer
  • Heat Treatment:Nitriding
  • Mould Base:S50c,C45
  • Customized:Customized
  • Standard:Dme,Lkm,Hasco
  • Certification:ISO
  • Installation:Fixed
  • Design Software:Ug,PRO-E,Solidwork
  • Runner:Cold,Hot
  • Model NO.:JSL-T7712-3
  • T1 Time:50days
  • Offer After Sale Service:Yes
  • Transport Package:Wooden Crate
  • Specification:Dme
  • Trademark:JSLMOULD
  • Origin:Taizhou, China
  • HS Code:8480719090
  • Production Capacity:500 Sets Molds,Year

Description

product NameProfessional Custom 100 L Swing Lid Plastic Waste Bin Mold
Product material
pp
Core&Cavity Steel718/2738 ect 
Steel hardness
HRC35-38
Mould Standard
DME
Cavity Number
1
Injection System
side gate
Ejector System
ejector pin
Cycle Time
30 s
Tooling lead time
60 days
Mould life
500,000
Quality assurance
ISO9001
 
Our Advantage
1.High quality
2.Reasonable price
3.On time delivery
4.Good After-sale service
5.Strict quality control
6.All the mould are automotic.
 
Offer you
In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.ProcessingTimePrepare Steel5 daysCNC Machining10 daysDrill8 daysHeat treatment6 daysHigh speed CNC Machining7 daysAssembling and Fitting6 daysPolishing6 daysT1 mould test2 days1. Samples/Drawing & Requirement from you2. Mould design: we will Communicate& Exchange the opinion with you after you place order.3. Material Purchase: Steel cutting and Mould base tooling.  4. Assembling.5. Inspection of mould: following and controlling the tooling processing.6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you!7. Your instruction & confirmation for shipment.8. Ready made mould before packing.
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold
Professional Premium 100 L Swing Lid Plastic Waste Bin Mold