Mould

OEM Customized 9kg Twin Tub Washing Machine Plastic Injection Mould

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.
  • Process Combination Type:Single-Process Mode
  • Plastic Material:ABS
  • Mould Cavity:Single Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Application:Household Appliances

Base Info

  • Transport Package:High Quality Wooden Case
  • Quality Control:in House Professional QC
  • Mould Base:S50c
  • Mould Standard:Dme, Hasco, Lkm
  • Steel Hardness:HRC34-38
  • Core&Cavity Steel:718
  • Customized:Customized
  • Standard:DME
  • Certification:ISO
  • Installation:Fixed
  • Design Software:UG
  • Runner:Hot Runner
  • Model NO.:Mould-N0606-8
  • Specification:DME
  • Trademark:JSLmould
  • Origin:Huangyan, Taizhou, China
  • HS Code:8480719090
  • Production Capacity:300sets,Per Year

Description

Product NameOEM Customized 9kg Twin tub washing machine plastic injection mouldProduct materialABS/PPCore&Cavity Steel718Steel hardness HRC34-38Mould StandardDMECavity NumberONEInjection SystemSide gateEjector Systemejector plateCycle Time65sTooling lead time60 daysMould life500,000Quality assuranceISO9001 Our Advantage1.High quality2.Reasonable price3.On time delivery4.Good After-sale service5.Strict quality control6.All the mould are automotic. Main QC Procedure
mould design control
mould steel certificated
mould steel hardness inspection
mould steel electrodes inspection
mould core and cavity steel dimension inspeciton
mould pre assembly inspection
mould trial report and sample inspection
mould pre shipment trial inspection
export mould package inspection.

FAQ:
 
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.

2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.

4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.
OEM Customized 9kg Twin Tub Washing Machine Plastic Injection Mould
OEM Customized 9kg Twin Tub Washing Machine Plastic Injection Mould
OEM Customized 9kg Twin Tub Washing Machine Plastic Injection Mould
OEM Customized 9kg Twin Tub Washing Machine Plastic Injection Mould
OEM Customized 9kg Twin Tub Washing Machine Plastic Injection Mould