
Plastic Auto Parts Put Cup Mould
Qingdao Root Industrial and Trading Co., Ltd.- Process Combination Type:Single-Process Mode
- Plastic Material:PA6+15gf
- Mould Cavity:Single Cavity
- Surface Finish Process:Polishing
- Shaping Mode:Injection Mould
- Application:Car, Household Appliances
Base Info
- Transport Package:Wooden Case
- Injection Machine Size:780 Tons
- Lead Time:20-30 Days
- Cavity:1X1
- Resin:PA6+15gf
- Customized:Customized
- Standard:HASCO
- Certification:ISO
- Installation:Fixed
- Design Software:UG
- Runner:Hot Runner
- Model NO.:RTIM-2010001
- Specification:CE,SGS,RoSH
- Trademark:Root
- Origin:Qingdao Shandong
- HS Code:8480710090
- Production Capacity:50, 000 PCS,Year
Description
Basic Info.
Model NO. RTIM-2010001 Runner Hot Runner Design Software UG Installation Fixed Certification ISO Standard HASCO Customized Customized Resin PA6+15gf Cavity 1X1 Lead Time 20-30 Days Injection Machine Size 780 Tons Transport Package Wooden Case Specification CE/SGS/RoSH Trademark Root Origin Qingdao Shandong HS Code 8480710090 Production Capacity 50, 000 PCS/YearProduct Description
Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.Professional Auto Engine Part Mould Manufacturer over 10 years, certificated by ISO 9001: 2008.
Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically




Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1200 Ton
Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.
Payment and Delivery
Payment: TT 50% in advance, Balance before shipment
Delivery Time: 30-45 days