
Auto Engine Plastic Part Injection Mould
Qingdao Root Industrial and Trading Co., Ltd.- Plastic Material:PA6+15gf
- Mould Cavity:Multi Cavity
- Surface Finish Process:Polishing
- Shaping Mode:Injection Mould
- Process Combination Type:Single-Process Mode
- Application:Car
Base Info
- Transport Package:Wooden Box
- Injection Machine Size:200 Tons
- Lead Time:20-30 Days
- Cavity:1X2
- Resin:ABS
- Customized:Non-Customized
- Standard:MISUMI
- Certification:ISO
- Installation:Fixed
- Design Software:UG
- Runner:Cold Runner
- Model NO.:RTIM-2008008
- Specification:CE,SGS,RoSH
- Trademark:Root
- Origin:Qingdao Shandong
- HS Code:8480710090
- Production Capacity:360 Sets,Year
Description
Basic Info.
Model NO. RTIM-2008008 Runner Cold Runner Design Software UG Installation Fixed Certification ISO Standard MISUMI Customized Non-Customized Resin ABS Cavity 1X2 Lead Time 20-30 Days Injection Machine Size 200 Tons Transport Package Wooden Box Specification CE/SGS/RoSH Trademark Root Origin Qingdao Shandong HS Code 8480710090 Production Capacity 360 Sets/YearProduct Description




Professional Auto Engine Part Mould Manufacturer over 10 years, certificated by ISO 9001: 2008.
Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically
Specification:
Item: Plastic Injection Mold
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1200 Ton
Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.
Payment and Delivery
Payment: TT 50% in advance, Balance before shipment
Delivery Time: 30-45 days
Updated on 17/06/19