
24/410 Injection Plastic Cap Mould Flip Top Cap Injection Plastic Mold
TAIZHOU HUANGYAN DAELONG MOLD CO., LTD.- Process Combination Type:Compound Die
- Plastic Material:PP
- Mould Cavity:Multi Cavity
- Shaping Mode:Injection Mould
- Surface Finish Process:Heat Treatment
- Application:Household Appliances, Commodity, Home Use, Daily Cosmetic Product
Base Info
- Specification:600*500*550
- Transport Package:Wooden Package
- Model No,:Bottle Cap Mold
- Customized:Customized
- Standard:DME
- Certification:CE, SGS
- Installation:Fixed
- Design Software:UG
- Runner:Hot Runner , Cold Runner
- Model NO.:Flip top cap mould
- Trademark:DAELONG
- Origin:Taizhou Zhejiang China
- HS Code:848071
- Production Capacity:200 Sets,Year
Description
Basic Info.
Model NO. Flip top cap mould Runner Hot Runner / Cold Runner Design Software UG Installation Fixed Certification CE, SGS Standard DME Customized Customized Model No, Bottle Cap Mold Transport Package Wooden Package Specification 600*500*550 Trademark DAELONG Origin Taizhou Zhejiang China HS Code 848071 Production Capacity 200 Sets/YearProduct Description
Product name | 24/410 flip top cap mold |
Cavity number | Customer's requirement (range from 4-24 cavities) |
Mold structure | Hot runner or cold runner with inner closing system |
Mold core/cavity steel | S136,M310,W302,8407,SKD61 |
Product material | PP |
Delivery time | 70-80 days after confirmed mold drawing and product drawing |
Life time | 3,000,000 shots |
Package | Standard package for oversea |

MOULD MANUFACTURE PROCESS
Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing
BUSINESS STEPS
1. R&D We support customers R&D. We will make the files or improve the design if you need
2. Quotation Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.
3. Negotiation The negotiation includes quality, price, material,delivery time,payment term,ect.
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design.
5. Mould We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.
6. Mould Testing When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.
7. Delivery We will delivery the goods to the customers either by sea or by air.


FAQ
Q: What is your trade term?
A: Normally FOB Ningbo or Shanghai
Q: What is your payment term?
A: 30% down payment against PO, 70% balance payment before the shipment.
Q: What is your delivery time?
A: Normally in 55-65 days , depend on the mold structure.
IF YOU WANT TO KNOW MORE INFO, PLEASE CONTACT ME.
Steven Rao
TAIZHOU HUANGYAN DAELONG MOLD CO.,LTD