Mould

PPR Water Supply Pipe Fitting Injection Mould

Zhejiang Taizhou Huangyan Jingzheng Mould Co., Ltd.
  • Process Combination Type:Single-Process Mode
  • Plastic Material:PPR
  • Mould Cavity:Multi Cavity
  • Shaping Mode:Injection Mould
  • Surface Finish Process:Polishing
  • Application:Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware

Base Info

  • Hardness of Wear Parts:42-48HRC
  • Hardness of Cavity & Core:42-45HRC
  • Advantage:with Good Quality and Competitive Price
  • Delivery Time:35-75 Working Days
  • Mould Life 3:718: 1, 000, 000shots
  • Mould Life 2:P20: 500, 000shots
  • Mould Life 1:45# :300, 000-500, 000shots
  • Mould Base:Lkm, Hasco
  • Mould Material:45#, P20, H13, 718, 2738, Nak80, S136.
  • Cavity Number:Customized
  • Product Material:PPR
  • Name:PPR Pipe Fitting Mould
  • Customized:Customized
  • Standard:HASCO
  • Certification:ISO
  • Installation:Fixed
  • Design Software:AutoCAD
  • Runner:Cold Runner
  • Model NO.:JZ
  • Mould Accessories:Dme,Hasco Standard
  • Gurantee:12 Month
  • Transport Package:Wooden Box
  • Specification:customized size
  • Trademark:Jingzheng
  • Origin:China
  • HS Code:8480719090
  • Production Capacity:1200sets,Year

Description

Mould Life45# :300,000-500,000shotsP20: 500,000shots718: 1,000,000shotsDesign softwareUG,PROE,CADetc.Plastic materialPP,PE,ABS,PC PET pa66 .Delivery time30 -75 working days Specification with good quality competitive price
Mould Making:
1.Samples/Drawing &Requirement from you
2.Mould design:we will Communicate and Exchange the opinion with you after you  place order.
3.Material Purchase:Steel cutting and Mould base tooling.  
4.Assembling.
5.Inspection of mould:following and controlling the tooling processing. 
6.Mould testing:We will inform you the date.Than will send the sample's inspection, report&injection parameters with the sample to you!
7.Your instruction &confirmation for shipment.
8.Ready made mould before packing.


Our advantages:

1.Good experience in mould making since the year of 1998.

2.Patent in collapsible fitting moulds.

3.Machinery core pulling system save cost and increase production efficiency.

4.Perfect core pulling distance within 180mm.

5.Excellent R&D team.(We can offer you 3D mould design with all details within one day.)

6.Efficiency production department.(We can finish Push-Fit fitting mould of size 110mm in stwo cavity with in 45days.)

7.Competitive price in save level of mould manufactuers.

PPR Water Supply Pipe Fitting Injection Mould
PPR Water Supply Pipe Fitting Injection Mould
PPR Water Supply Pipe Fitting Injection Mould
PPR Water Supply Pipe Fitting Injection Mould
PPR Water Supply Pipe Fitting Injection Mould
PPR Water Supply Pipe Fitting Injection Mould
PPR Water Supply Pipe Fitting Injection Mould