Mould

OEM ODM Service Injection Rubber Mould for Custom Molded Rubber Plastic Parts

Shanghai MY Mould Co., Ltd.
  • Process Combination Type:Compound Die
  • Plastic Material:ABS
  • Mould Cavity:Multi Cavity
  • Shaping Mode:Injection Mould
  • Surface Finish Process:Mirror Polishing
  • Application:Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware

Base Info

  • Heat Treatment of Steel:HRC48-52
  • Shape:Based on Drawings
  • Production Material:as Per Client′s Requirement
  • Cavity:as Per Client′s Requirement
  • Cycle Time:15-60s
  • Mold Steel:P20,718,2738h,Nak80,H13,8407,1.2344
  • Gate Type:Yudo Runner, Hot Runner, Cold Runner, Sub Gate,Edg
  • Customized:Customized
  • Standard:Local,Hasco,Dme,Misumi
  • Certification:TS16949, ISO, FDA
  • Installation:Fixed
  • Design Software:Ug,CAD,Moldflow,Proe,Catia,Solidwork
  • Runner:Hot Runner
  • Model NO.:MY0472
  • Our Service:Dfm Report,Mould Flow,Mould Design,Mpr,QC Report,
  • Transport Package:Carton
  • Specification:Customized
  • Trademark:MYMOULD
  • Origin:Shanghai, China
  • HS Code:8480719090
  • Production Capacity:50 Sets,Month

Description

Mould material

100~300k, Mould Material(Soft Mould):P20,718,2738......
300~500k, Mould Material(Hard Mould):H13,S136,2344......
500~1000k, Mould Material(Hard Mould):2343EFS,2344ESR, 2367ESR,SKD61......

Specific feed/gate locations           OEM ODM Service Injection Rubber Mould for Custom Molded Rubber Plastic PartsSurface finish
Commercial polishing (General Polishing) 
Highly polish (Mirror Polish)
Matte Finish (EDM Treatment)

 3D/2D drawings
STP/ STEP, IGS/ IGES, x_t, CAD
 

Fast mould design

We can be within 1-3 working days after getting customer's drawings. 

Lead time

35 - 45 days after getting the mould design confirmation. 

Mould testing

All of the moulds can be well tested before the shipments. Videos testing the moulds are available. 

Minimum order

Small orders can be accepted. 

Production capacity

45-50 sets/month. 

Port

Shanghai

Runner

YUDO runner, hot Runner, cold runner ... ...

Payment terms

L/C T/T Western Union MoneyGram. 

Mould making service

OEM/ODM service is available. 

After-sales service

Life-long gurantee, Comes with free mold parts.

Safe packing

In strong wooden pallets to avoid any damages during long transportation. 

OEM ODM Service Injection Rubber Mould for Custom Molded Rubber Plastic Parts
OEM ODM Service Injection Rubber Mould for Custom Molded Rubber Plastic Parts
OEM ODM Service Injection Rubber Mould for Custom Molded Rubber Plastic Parts
OEM ODM Service Injection Rubber Mould for Custom Molded Rubber Plastic Parts


OEM ODM Service Injection Rubber Mould for Custom Molded Rubber Plastic PartsOEM ODM Service Injection Rubber Mould for Custom Molded Rubber Plastic Parts                                                                             Why Customers Choose Us?
We have been engaged in this field for 15 years, we've served customers from the United States, the United Kingdom, Spain, Australia, Singapore, Russia and other countries.
Professional Certification
Quality control and technology improvement
•ISOIS09001:2000
•SGS certificate
•The complete quality control system.
Precision durable mold.
•3 CNC: Precision 0.005mm
•1 Three dimension:1Precision 0.001mm  
•1 wire drive slowly: Precision 0.002mm
•2 Mirror discharge: Precision 0.005mm
100% Guaranteed Quality
•100% tested(Not Just Batch Tested)
•SOP standard production.
•IQC(tested all in matical )-IPQC(tested first parts and prodcut)-FQC(tested finished parts)-OQC(Shipments) 
•10 professional quality control inspectors
Competitive price and service
•Delivery time: 2-3 Weeks after order
•Provide new design for customers' requirements
•Provide DFM Report,Moldflow,Mould Design,MPR,QC Report, Injection parameter sheet,Testing video.
•Free provided sample.
•10-20% cheaper than other competitors
•Return the entire mould cost  if you order  500,000pcs  product.
•Life-long guarantee period, which is much longer among this field.