Mould

Plastic Big Chair Mould

Taizhou Remo Plastic Mould Co., Ltd.
  • Application:Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware
  • Process Combination Type:Single-Process Mode
  • Plastic Material:PP
  • Mould Cavity:Single Cavity
  • Shaping Mode:Injection Mould
  • Surface Finish Process:Polishing

Base Info

  • Special Service:Weekly Report and Machining Photos Available
  • Cooling System:Water Cooling with Excellent Cooling Effect
  • Hot Runner Brand:Chinese Brand Hot Runner with High Quality
  • Approximate Mould Weight:8 Tons
  • Core&Cavity Steel:P20 or 718
  • Back Changeable:Available
  • Logo Changeable:Available
  • Design Time:2-3 Days for 2D,3D Drawing
  • Name:Chair Mould
  • Standard:DME
  • Installation:Semi Fixed
  • Design Software:UG
  • Runner:Hot Runner
  • Model NO.:RNCM-150111311
  • Sample Time:2 Months
  • Transport Package:Wooden Case
  • Specification:SGS certified
  • Trademark:REMO
  • Origin:China
  • HS Code:8480710090
  • Production Capacity:55 Sets,Month

Description

Description  Products' infomation we need to make quotationClear Pics/material/size/weight/wall thickness/targetting quantity and etc.  Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc  Mould Base LKM, HASCO ect.  Cavity Single/multi  Runner Hot/cold   Mould Design3D/2D Drawing  Design Days 3 days  Design Software UG, PROE, CAD, CAE, CAM, CAXA ect   Plastic MaterialPP, PC, PS, PE, PU, PVC, ABS, PMMA ect   Mould Life 300, 000-3, 000, 000 shots   Injection SystemPin-point-gate  Polish SystemMirror Polish  Payment40% of Deposit by T/T, 60% of Balance by T/T  Delivery Time 15-60days   Specification Depends on customers requirements   Business Step 1. R& DWe support customer R& D. Make the files or improve the design if you needed ↓ ↓ ↓2. Quotation MakingMould Quotation will be finished in 1 day according to information we get↓ ↓ ↓3. Negotiation The quality, price, material, delivery time. payment item. ect ↓ ↓ ↓4. Mould Design 3-5 days for mould and product 3D/2D drawing design↓ ↓ ↓5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days ↓ ↓ ↓6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.↓ ↓ ↓7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory   ↓ ↓ ↓  8. Delivery Delivery goods by sea or by air, according  customers requirement