Mould

RM0301055 Big Chair Mould / Armless Chair Mould /Arm-Chair Mould

Taizhou Remo Plastic Mould Co., Ltd.
  • Plastic Material:PP
  • Mould Cavity:Single Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Process Combination Type:Compound Die
  • Application:Furniture

Base Info

  • Sample Time:45-60 Days According to Chair Size,Shape
  • 3D Design:Solidworks , Ug
  • Mould Life:1,000,000 Shots
  • Surface Treatment:Polish , Texture,Nitriding,Chrome
  • Base Material:45# Steel
  • Mould Material:P20 , 718
  • Hot Runner Brand:Chinese , Yudo , Hasco , etc..
  • Runner System:Hot Runner
  • Name:Big Chair Mould
  • Customized:Customized
  • Standard:HASCO
  • Installation:Semi Fixed
  • Design Software:UG
  • Runner:Hot Runner
  • Model NO.:RM0301055
  • Inserts:Back Inserts Changeable
  • Transport Package:Wooden Case
  • Specification:International Standard
  • Trademark:REMO
  • Origin:China
  • HS Code:8480719090
  • Production Capacity:55 Sets,Month

Description

Description  Products' infomation we need to make quotationClear Pics/material/size/weight/wall thickness/targetting quantity and etc.  Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc  Mould Base LKM, HASCO ect.  Cavity Single/multi  Runner Hot/cold   Mould Design3D/2D Drawing  Design Days 3 days  Design Software UG, PROE, CAD, CAE, CAM, CAXA ect   Plastic MaterialPP, PC, PS, PE, PU, PVC, ABS, PMMA ect   Mould Life 300, 000-3, 000, 000 shots   Injection SystemPin-point-gate  Polish SystemMirror Polish  Payment40% of Deposit by T/T, 60% of Balance by T/T  Delivery Time 15-60days   Specification Depends on customers requirements           Business Step 1. R& DWe support customer R& D. Make the files or improve the design if you needed ↓ ↓ ↓2. Quotation MakingMould Quotation will be finished in 1 day according to information we get↓ ↓ ↓3. Negotiation The quality, price, material, delivery time. payment item. ect ↓ ↓ ↓4. Mould Design 3-5 days for mould and product 3D/2D drawing design↓ ↓ ↓5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days ↓ ↓ ↓6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.↓ ↓ ↓7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory   ↓ ↓ ↓  8. Delivery Delivery goods by sea or by air, according  customers requirement