
Well Designed Toy Dump Trunk Mould
Taizhou Remo Plastic Mould Co., Ltd.- Plastic Material:PP, PC, PS, PE, PU, PVC, ABS, PMMA Ect
- Mould Cavity:Single Cavity
- Surface Finish Process:Polishing
- Shaping Mode:Injection Mould
- Process Combination Type:Single-Process Mode
- Application:Car, Toy
Base Info
- Others:R&D Service Available
- Delivery Time:45-60 Days
- Mould Base:45#
- Mould Steel:45# , P20 , 718 , S136
- Mould Life:1,000,000 Shots
- Cooling System:Water Cooling
- Hot Runner System:Chinese Brand , International
- Cavity Numbers:Single , Multi
- Molding Type:Injection
- Name:Dump Truck Mould
- Customized:Customized
- Standard:HASCO
- Installation:Fixed
- Design Software:UG
- Runner:Hot or Cold Runner
- Model NO.:RM0301025
- Transport Package:Wooden Case
- Specification:International Standard
- Trademark:REMO
- Origin:Taizhou China
- HS Code:8480719090
- Production Capacity:25 Sets,Month
Description
Following information is essential for your better understanding on our moulds Name Description Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc. Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc Mould Base LKM, HASCO ect. Cavity Single/multi Runner Hot/cold Mould Design 3D/2D Drawing Design Days 3 days Design Software UG, PROE, CAD, CAE, CAM, CAXA ect Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect Mould Life 300, 000-3, 000, 000 shots Injection System Pin-point-gate Polish System Mirror Polish Payment 40% of Deposit by T/T, 60% of Balance by T/T Delivery Time 15-60days Specification Depends on customers requirements Business Step 1. R& D We support customer R& D. Make the files or improve the design if you needed ↓ ↓ ↓ 2. Quotation Making Mould Quotation will be finished in 1 day according to information we get ↓ ↓ ↓ 3. Negotiation The quality, price, material, delivery time. payment item. ect ↓ ↓ ↓ 4. Mould Design 3-5 days for mould and product 3D/2D drawing design ↓ ↓ ↓ 5. Mould According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days ↓ ↓ ↓ 6. Mould Testing When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. ↓ ↓ ↓ 7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory ↓ ↓ ↓ 8. Delivery Delivery goods by sea or by air, according customers requirement