Plastic Spreader Seed Sower Hand Held Seeder Mould
Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.- Plastic Material:PP
- Mould Cavity:Single Cavity
- Surface Finish Process:Polish or Texture
- Shaping Mode:Injection Mould
- Process Combination Type:Single-Process Mode
- Application:Home Use
Base Info
- Mould 1st Text:60days
- Mould Report:7-10days Per Time
- Mould Design:7days
- Engineer Teams:22 Years Experience
- Heat Treatment:Nitriding, etc
- Mould Operating Mode:Automatically by CNC
- Mould Design Software:Ug, Proe, Solidworks CAD, Ect
- Machine Equipment:CNC,EDM,Wire Cutting Machine,Drilling,Grinding
- Mould Cooling System:by Experienced Designer
- Mould Quality Control:Professional QC in House Machine
- Mould Base:S50c,C45
- Customized:Customized
- Standard:Dme,Hasco,Lkm Ect
- Certification:ISO
- Installation:Fixed
- Design Software:Ug,PRO-E,Solidwork Ect
- Runner:Hot,Cold
- Model NO.:JSL-2020327-8
- Sample:Availabel
- Quality Garantee:1 Year
- Transport Package:High Quality Wooden Case
- Specification:AS Requirement
- Trademark:JSLMOULD
- Origin:Huangyan, Taizhou, China
- HS Code:8480719090
- Production Capacity:500sets,Year
Description
Our Advantage 1. High quality 2. Reasonable price 3. On time delivery 4. Good After-sale service 5. Strict quality control 6. All the mould are automotic. Offer you In-time response on letters, telephone calls or fax In-time supply the quotation and mould designs In-time communication on the technical points In-time sending pictures for the mould machining progress and mould finishing schedule In-time mould test and sample delivery In-time mould delivery.
1. Samples/Drawing & Requirement from you 2. Mould design: we will Communicate& Exchange the opinion with you after you place order. 3. Material Purchase: Steel cutting and Mould base tooling. 4. Assembling. 5. Inspection of mould: following and controlling the tooling processing. 6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! 7. Your instruction & confirmation for shipment. 8. Ready made mould before packing.
For more information please contact us.






Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 day |
For more information please contact us.