Mould

Plastic Switch Mold

Taizhou Remo Plastic Mould Co., Ltd.
  • Process Combination Type:Progressive Die
  • Plastic Material:PA66+GF
  • Mould Cavity:Multi Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Application:Household Appliances, Commodity, Electronic

Base Info

  • T1 Sample Time:45-50 Days
  • 3D Design:Ug , Solidworkds for 3 Days
  • Cooling Design:Water Cooling
  • Mould Life:500,000-800,000 Shots
  • Base Material:P20
  • Cav&Core Material:S136 , H13 , 2316
  • Cavity Nos:Multi Cavity up to 48 Cavity
  • Runner Type:Cold Runner
  • Name:Plastic Switch Mould
  • Customized:Customized
  • Standard:HASCO
  • Installation:Semi Fixed
  • Design Software:UG
  • Runner:Hot Runner
  • Model NO.:RMBM16-01601312
  • Special Service:Weekly Report with Machinning Photos Available
  • Transport Package:Wodden Case
  • Specification:SGS certified
  • Trademark:REMO
  • Origin:Taizhou China
  • HS Code:8480719090
  • Production Capacity:55 Sets,Month

Description

Mould Manufacture Flow Chart As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.      Following information is essential for your better understanding on our moulds        Name Description  Products' infomation we need to make quotationClear Pics/material/size/weight/wall thickness/targetting quantity and etc.  Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc  Mould Base LKM, HASCO ect.  Cavity Single/multi  Runner Hot/cold   Mould Design3D/2D Drawing  Design Days 3 days  Design Software UG, PROE, CAD, CAE, CAM, CAXA ect   Plastic MaterialPP, PC, PS, PE, PU, PVC, ABS, PMMA ect   Mould Life 300, 000-3, 000, 000 shots   Injection SystemPin-point-gate  Polish SystemMirror Polish  Payment40% of Deposit by T/T, 60% of Balance by T/T  Delivery Time 15-60days   Specification Depends on customers requirements           Business Step 1. R& DWe support customer R& D. Make the files or improve the design if you needed ↓ ↓ ↓2. Quotation MakingMould Quotation will be finished in 1 day according to information we get↓ ↓ ↓3. Negotiation The quality, price, material, delivery time. payment item. ect ↓ ↓ ↓4. Mould Design 3-5 days for mould and product 3D/2D drawing design↓ ↓ ↓5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days ↓ ↓ ↓6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.↓ ↓ ↓7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory   ↓ ↓ ↓  8. Delivery Delivery goods by sea or by air, according  customers requirement