
PVC Water Pipe Injection Molding/Pipe Fittings Mould
Shanghai MY Mould Co., Ltd.- Process Combination Type:Compound Die
- Plastic Material:ABS
- Mould Cavity:Multi Cavity
- Shaping Mode:Injection Mould
- Surface Finish Process:Mirror Polishing
- Application:Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware
Base Info
- Heat Treatment of Steel:HRC48-52
- Shape:Based on Drawings
- Production Material:as Per Client′s Requirement
- Cavity:as Per Client′s Requirement
- Cycle Time:15-60s
- Mold Steel:P20,718,2738h,Nak80,H13,8407,1.2344
- Gate Type:Yudo Runner, Hot Runner, Cold Runner, Sub Gate,Edg
- Customized:Customized
- Standard:Local,Hasco,Dme,Misumi
- Certification:TS16949, ISO, FDA
- Installation:Fixed
- Design Software:Ug,CAD,Moldflow,Proe,Catia,Solidwork
- Runner:Hot Runner
- Model NO.:w107
- Our Service:Dfm Report,Mould Flow,Mould Design,Mpr,QC Report,
- Transport Package:Carton
- Specification:Customized
- Trademark:MYMOULD
- Origin:Shanghai, China
- HS Code:8480719090
- Production Capacity:50 Sets,Month
Description
Mould material
Plastic mould material: P20 steel, 718, 2738,H13, NAK80,1.2344,2343,S136,etc....
Fast mould design
We can be within 1-3 working days after getting customer's drawings.
Lead time
Plastic moulds: 2- 7 weeks after getting the mould design confirmation.
Mould testing
All of the moulds can be well tested before the shipments. Videos testing the moulds are available.
Minimum order
Small orders can be accepted.
Production capacity
45-50 sets/month.
Port
Shanghai
Runner
Payment terms
L/C T/T Western Union MoneyGram.
Mould making service
OEM/ODM service is available.
After-sales service
Life-long gurantee.
Safe packing
In strong wooden pallets to avoid any damages during long transportation.









