Mould

Plastic Mould Mold Maker to Product Flip Top Cap Plastic Cap for Bottles

Dongguan Yixun Industrial Co., Ltd.
  • Process Combination Type:Progressive Die
  • Plastic Material:ABS
  • Mould Cavity:Multi Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Application:Electronic, Home Use, Socket

Base Info

  • Specification:Customizd
  • Transport Package:According to Products or Requirements
  • Customized:Customized
  • Standard:HASCO
  • Certification:TS16949, CE, ISO, FDA, SGS,ISO9001
  • Installation:Fixed
  • Design Software:AutoCAD
  • Runner:Hot Runner
  • Model NO.:YIXUN
  • Trademark:Yixun
  • Origin:China, Guangdong
  • HS Code:8477409000
  • Production Capacity:50set,Month

Description

Overview Product Parameters

https://yixunmold.en.made-in-china.com/product-list-1.html

Company Profile

 

Plastic Mould Mold Maker to Product Flip Top Cap Plastic Cap for Bottles

Dongguan YIXUN Industrial Co.,Ltd is a high technology company,specializing in many kinds of plastic mold designing,manufacturing and injecting,mainly covering the enclosure and part of automobile,electrical,printer,commodity,electronic etc.

YiXun has 2 manufacturing facilities, totally 12,000 square meters, 260 employees, 90% of them has experience over 10 years.

YiXun yearly capability is up to 600 sets mold per year, the biggest reach 25 tons.

YiXun adopt the up-to-date design software, such as Auto CAD, UG, Pro/E, Solid Works etc, Mould standards such as DME, HASCO, FUTABA, LKM and so on.

YiXun has a full set advanced mould manufacturing equipment, 8 sets CNC machines, 15 sets EDM machine, 3 sets middle speed Wire Cut Machine, 2 sets slow speed Wire Cut Machine, 15 sets Milling Machine, 4 sets lathe machine, 2sets mold die fitting machine,17 sets injection machine from 35 tons to 818 tons.




Plastic Mould Mold Maker to Product Flip Top Cap Plastic Cap for Bottles


Plastic Mould Mold Maker to Product Flip Top Cap Plastic Cap for Bottles
Mold FAQ

Q:How about your quality control?
A:We have professional team to control mold quality, since we realize that quality control is the first priority to run business.

Q:What's your lead time?
A:For most mold, 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

Q:How long can i get the sample?
A:Depends on your specific items,within 3-7 days is required generally.

Q:What about after service?
A:Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.Plastic Mould Mold Maker to Product Flip Top Cap Plastic Cap for Bottles



Production  Details