Mould

Battery Case Cap Mould

Taizhou Remo Plastic Mould Co., Ltd.
  • Plastic Material:PP
  • Mould Cavity:Multi Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Process Combination Type:Single-Process Mode
  • Application:Commodity

Base Info

  • Transport Package:Wooden Case
  • Machining:CNC, EDM
  • Certificate:ISO9001
  • Customized:Customized
  • Standard:HASCO
  • Installation:Fixed
  • Design Software:UG
  • Runner:Hot Runner
  • Trademark:REMO
  • Origin:Taizhou China
  • Production Capacity:25 Sets,Month

Description

Mould Manufacture Flow Chart As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.





Following information is essential for your better understanding on our moulds







Name Description

Products' infomation we need to make quotationClear Pics/material/size/weight/wall thickness/targetting quantity and etc.

Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc

Mould Base LKM, HASCO ect.

Cavity Single/multi

Runner Hot/cold 

Mould Design3D/2D Drawing

Design Days 3 days

Design Software UG, PROE, CAD, CAE, CAM, CAXA ect 

Plastic MaterialPP, PC, PS, PE, PU, PVC, ABS, PMMA ect 

Mould Life 300, 000-3, 000, 000 shots 

Injection SystemPin-point-gate

Polish SystemMirror Polish

Payment40% of Deposit by T/T, 60% of Balance by T/T

Delivery Time 15-60days 

Specification Depends on customers requirements 









Business Step 1. R& DWe support customer R& D. Make the files or improve the design if you needed ↓ ↓ ↓2. Quotation MakingMould Quotation will be finished in 1 day according to information we get↓ ↓ ↓3. Negotiation The quality, price, material, delivery time. payment item. ect ↓ ↓ ↓4. Mould Design 3-5 days for mould and product 3D/2D drawing design↓ ↓ ↓5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days ↓ ↓ ↓6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.↓ ↓ ↓7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory   ↓ ↓ ↓  8. Delivery Delivery goods by sea or by air, according  customers requirement