
Precision Progressive Die Factory Price China Mold Maker in Die Tapping
Zhongshan Huihai Mold & Automatic Equipment Co., Ltd.- Process Combination:Progressive Die
- Technics:Forming Die
- Processing Method:Forming Mould
- Material:Hard Alloy and Steel Bonded Carbide
- Application:Car, Home Use
- Manufacturing Technology:Computer Technology
Base Info
- Transport Package:Wooden Case
- Stamping Material:Stainless Steel, Aluminum Alloy, Brass, Copper etc
- Design Software:Auto CAD, Cae, PRO-E, Solidworks, Ug etc
- Standard:Dayton Misumi
- Tolerance:+-0.01mm
- Model No:Hh014
- Customized:Customized
- Packing:Wooden Case
- Lead Time:50 Days
- Name:Sheet Metal Auto Parts Progressive Stamping Dies
- Parts Detection Method:Measurement of Three Axis NC
- Milling Speed:Normal Speed
- Mold Cavity Technology:CNC Milling
- Driving Motor Type:Permanent Magnet
- Model NO.:ST009
- Specification:SGS, ISO
- Trademark:huihai auto
- Origin:Zhongshan
- HS Code:8207209000
- Production Capacity:350 Sets ,Year
Description
Basic Info.
Model NO. ST009 Driving Motor Type Permanent Magnet Mold Cavity Technology CNC Milling Milling Speed Normal Speed Parts Detection Method Measurement of Three Axis NC Name Sheet Metal Auto Parts Progressive Stamping Dies Lead Time 50 Days Packing Wooden Case Customized Customized Model No Hh014 Tolerance +-0.01mm Standard Dayton Misumi Design Software Auto CAD, Cae, PRO-E, Solidworks, Ug etc Stamping Material Stainless Steel, Aluminum Alloy, Brass, Copper etc Transport Package Wooden Case Specification SGS, ISO Trademark huihai auto Origin Zhongshan HS Code 8207209000 Production Capacity 350 Sets /YearProduct Description
Our Advantages:
1. Competitive price
2. Strict quality control system (ISO9001 system manage)
3. Quick mold making and delivery (4-7weeks)
4. Advanced equipment, excellent R&D teams
5. Professional technicians and rich experienced workers
Huihai specializes in manufacturing and supplying of various moulds and dies, such as metal stamping dies, plastic injection moulds, motor stator&rotor molds and stamping parts and injection parts since 2005.
Huihai provides various molds & dies to the clients from USA, Spain, Italy, Russia and so on.
"Good quality with cost-effective" is the base of Huihai business. Huihai people keep creating value for customers as our mission.
ISO 9001: 2008 certificated.

Technical Specifications
Design Base | Customer product drawings or samples |
Mold material | Cr12mov, SKD11, D2, M2, DC 53, SKH-9, Copper alloy or the material customer required. |
Mold base | Standard mold base or customized |
Standard component | MISUMI, PUNCH, DAYTON, DANLY (or Customer required) |
Part material fit | SPCC, SPCE, SPCD, DC01, DC04, Stainless steel 304.430.316, Aluminum alloy, and so on |
Design software | CAE, UG, CAD |
Lead time: 4-7 weeks based on tooling construction

Processing Equipments
Machine Equipment | QTY | Tapping center | 1 |
CNC | 5 | Plate shears | 1 |
WEDM | 2 | Mechanical Press | 13 |
WEDM-HS | 2 | Hydraulic Press | 2 |
EDM | 3 | Inspection Equipment | Qty |
Radial drill | 8 | CMM | 1 |
Sawing machine | 1 | projector | 1 |
Grinding machine | 4 | Rockwell-hardness-tester | 1 |
Milling machine | 2 | Dial Calipers(0-300mm) | 8 |
Bench drill | 4 | Slide Calipers(0-1000) | 6 |
lathe | 2 | Pound scale | 1 |
Project process layout
To control the production time, and to decline the probability of clam & return from the end users, making a accurate mold is very important start , we have completed molding produced process to fulfill the needs of client.

Time Control
- Understanding and controlling the factors of any mold making process is the key to fulfill project control, we use computer analysis and specialized division to take care of controlling mold component unit and predicting work hour.
- The Parts we'll take into consideration



FAQs:
Q. What is your standard lead-time?
A. It is difficult to provide a standard lead-time without specific details regarding the particular part, the material gage, the surface requirement or other specific details required. But we control our normal lead-time is from 30 to 60 days.
Q. What is your on-time delivery record?
A. Our on-time delivery records is tracked, monitored, and communicated as we work to meet a 100% on-time delivery goal. Delivery is very important to our customers who need it to meet the hot sale period and it is very important for us to keep the long term relationship between us and our customers. Our on-time delivery record for last several years averages between 98% to 100%, and we make always 100% as our goal.
Q. How do you control your manufacturing processes?
A. Every part we manufacture starts with a complete review of the print, tolerances, customer specific part requirements and customer demands to insure all steps are on foot properly. We offer inspection document including setup sheet, materials we use, testing requirements, package requirements. If you need, we will schedule a kickoff meeting with you that maybe better.
Q. What's your finishing services?
A. Usually we offer polishing, painting, plating, heat treating and TD costing.
Q. What type of quality system you have?
A. We are certificated to SGS factory audit, ISO9001: 2008.
Q. Is small quantity is available?
A. Yes, we can accept the small quantity, even 1 set of stamping dies.
Q. How do you ship the goods?
A. We have the cooperate forwarder, they can ship your goods in short time with the favorable cost to your destination ports. B/L or telex release. Or you can use your shipping agent is available.
FORE MORE INFORMATION AND QUESTION, PLEASE FEEL FREE TO CONTACT WHAT'S APP AND WECHAT OR EMAIL.