Mould

Experienced Quality Injection Rattan Plastic Storage Drawer Mold

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.
  • Process Combination Type:Single-Process Mode
  • Plastic Material:PP
  • Mould Cavity:Single Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Runner:Hot Runner, Cold Runner

Base Info

  • Transport Package:Wooden Case
  • Offer After Sale Service:Yes
  • T1 Sample Time:50days
  • Mould Report:7-10days Per Time
  • Design:7days
  • Mould Operating Mode:Automatically
  • Heat Treatment:Nitriding or Thermal Refining
  • Mach Equipment:CNC,EDM,Wire Cutting Machine,Drilling,Grinding
  • Mould Quality Control:Professional QC
  • Mould Cooling System:by Experienced Designer
  • Mould Base:S50c,C45
  • Customized:Customized
  • Standard:Dme,Lkm,Hasco Ect
  • Certification:ISO
  • Installation:Mobile
  • Design Software:Ug,PRO-E,Solidwork
  • Model NO.:JSL-T7711-2
  • Specification:Dme
  • Trademark:JSLMOULD
  • Origin:China
  • HS Code:8480719090
  • Production Capacity:500sets,Year

Description

roduct NameExperienced Quality Injection Rattan Plastic Storage drawer Mold
Product material
pp
Core&Cavity Steel718
Steel hardness
HRC35-38
Mould Standard
DME
Cavity Number
1
Injection System
side gate
Ejector System
ejector pin
Cycle Time
30 s
Tooling lead time
60 days
Mould life
500,000
Quality assurance
ISO9001
 
Our Advantage
1.High quality
2.Reasonable price
3.On time delivery
4.Good After-sale service
5.Strict quality control
6.All the mould are automotic.
 
Offer you
In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.
 
 For more information please contact us.  
ProcessingTime
Prepare Steel5 days
CNC Machining10 days
Drill8 days
Heat treatment6 days
High speed CNC Machining7 days
Assembling and Fitting6 days
Polishing6 days
T1 mould test2 days
1. Samples/Drawing & Requirement from you2. Mould design: we will Communicate& Exchange the opinion with you after you place order.3. Material Purchase: Steel cutting and Mould base tooling.  4. Assembling.5. Inspection of mould: following and controlling the tooling processing.6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you!7. Your instruction & confirmation for shipment.8. Ready made mould before packing.
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold
Experienced Quality Injection Rattan Plastic Storage Drawer Mold