- T1 Sample Time:50days
- Mould Report:7-10days
- Design:7days
- Offer After Sale Service:Yes
- Mould Cooling System:by Experienced Designer
- Mould Operating Mode:Automatically
- Heat Treatment:Nitriding, etc
- Quality Control:in House Machine Professional QC
- Mach Equipment:CNC,EDM,Wire Cutting Machine,Drilling,Grinding
- Mould Base:S50c,C45
- Customized:Customized
- Standard:DME
- Certification:ISO
- Installation:Fixed
- Design Software:UG
- Runner:Hot Runner
- Model NO.:JSL-T7710-3
- Transport Package:Wooden
- Specification:DME
- Trademark:JSLMOULD
- Origin:Huangyan, Taizhou, China
- HS Code:8480719090
- Production Capacity:500sets,Per Year
Description
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |