Mould

China Professional Motorcycle Helmet Mould Manufacturer

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.
  • Plastic Material:ABS
  • Mould Cavity:Single Cavity
  • Surface Finish Process:Polish or Texture
  • Shaping Mode:Injection Mould
  • Process Combination Type:Single-Process Mode
  • Application:Motorcycle

Base Info

  • Mould Delivery Time:45-60days
  • Heat Treatment:Nitriding, etc
  • Aftersale Service:Yes
  • Mould Quality Control:Professional QC
  • Size:According to Customers Requirement
  • Mould Design Software:Ug, Proe, Solidworks CAD, Ect
  • Mould Cooling System:by Experienced Designer
  • Runner System:Hot,Cold Runner
  • Mould Base:S50c,C45
  • Customized:Customized
  • Standard:Dme,Lkm,Hasco Ect
  • Certification:ISO
  • Installation:Fixed
  • Design Software:Ug,PRO-E,Solidwork
  • Runner:Cold Runner
  • Model NO.:JSL-7725-1
  • Mould Report:7-10days
  • Transport Package:Wooden Crate
  • Trademark:JSL MOULD
  • Origin:China
  • HS Code:8480719090
  • Production Capacity:500sets,Year

Description


Product NameChina Professional Motorcycle helmet mould manufacturerProduct materialABSCore&Cavity Steel718Steel hardness: HRC35-38Mould StandardDMECavity NumberSINGLEInjection Systemdirect gateEjector Systemejector blockCycle Time40STooling lead time60daysMould life500,000 timesQuality assuranceISO9001
 
 
Our Advantage1.High quality2.Reasonable price3.On time delivery4.Good After-sale service5.Strict quality control6.All the mould are automotic.
 
 
Offer youIn-time response on letters, telephone calls or faxIn-time supply the quotation and mould designsIn-time communication on the technical pointsIn-time sending pictures for the mould machining progress and mould finishing scheduleIn-time mould test and sample deliveryIn-time mould delivery.
 
  ProcessingTimePrepare Steel5 daysCNC Machining10 daysDrill8 daysHeat treatment6 daysHigh speed CNC Machining7 daysAssembling and Fitting6 daysPolishing6 daysT1 mould test2 days 1. Samples/Drawing & Requirement from you2. Mould design: we will Communicate& Exchange the opinion with you after you place order.3. Material Purchase: Steel cutting and Mould base tooling. 4. Assembling.5. Inspection of mould: following and controlling the tooling processing.6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you!7. Your instruction & confirmation for shipment.8. Ready made mould before packing.