Mould

RM0301047 Medical Test Tube Mould

Taizhou Remo Plastic Mould Co., Ltd.
  • Plastic Material:PP
  • Mould Cavity:Multi Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Application:Commodity, Medical
  • Runner:Cold Runner

Base Info

  • Specification:International
  • Transport Package:Wooden Case
  • Special Service:Weekly Report Available
  • Hot Runner System:Valve Gate
  • Delivery Time:15-60 Days
  • Payment:40% of Deposit by T,T, 60% of Balance by T,T
  • Mould Life:300, 000-3, 000, 000 Shots
  • Design Days:3 Days
  • Mould Design:3D,2D Drawing
  • Mould Base:Lkm, Hasco etc
  • Mould Material:H13, Nak80, S136
  • Name:Plastic Test Tube Mold
  • Customized:Customized
  • Design Software:Ug, Proe, CAD, Cae, Cam, Caxa etc
  • Model NO.:RM0301047
  • Trademark:REMO
  • Origin:Taizhou China
  • HS Code:84807190
  • Production Capacity:50 Sets,Month

Description

Products' information we need to make quotationClear Pics/material/size/weight/wall thickness/targeting quantity and etc.

 Mould Material45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc

 Mould BaseLKM, HASCO ect.CavitySingle/multiRunnerHot/coldMould Design3D/2D DrawingDesign Days3 daysDesign SoftwareUG, PROE, CAD, CAE, CAM, CAXA ectPlastic MaterialPP, PC, PS, PE, PU, PVC, ABS, PMMA ectMould Life300, 000-3, 000, 000 shotsInjection SystemPin-point-gatePolish SystemMirror PolishPayment40% of Deposit by T/T, 60% of Balance by T/TDelivery Time15-60 days                                                                                                                          
Specification depends on customers requirements.
Business Steps1. R& DWe support customers' R& D. We'll make the files or improve the design if you need
 2. Quotation MakingMould Quotation will be finished in 1 day according to information we get.
 3. NegotiationThe quality, price, material, delivery time, payment item, ect.
 4. Mould Design3-5 days for mould and product 3D/2D drawing design
 5. MouldWe will build the mould based on customers' requirements. Before making the mould, we'll send mould design to customers' approval first. Mould will be usually finished in 25-60 days
 6. Mould TestingWhen moulds are finished, we will test the moulds to check if it will satisfy consumers' needs. And we will send samples for consumers' reference.
 7. Sample shootIf the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.
 8. DeliveryDelivery goods by sea or by air, according to customers' requirements.
Our advantages:
1; Excellent Cooling System with extended cooling pipe
2; Copper Cooling for better cooling effects
3; Pre-opening system to improve cycle time
4; Semi-Hot Runner System to save clients cost on moulds
5; Mould Available for recycle Material
6; Excellent control of polish system
7; Weekly report with mould processing photos available
8; Samples and each trial out video available
9; Punctual sample time and delivery time
10; Logistic  service available
11; Engineers available in client's factory for training
12; High quality mould with reasonable price


If you want to know more details, welcome to send an inquiry to us.