Mould

High Quality Experienced Plastic Drawer Box Mould

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.
  • Plastic Material:PP
  • Mould Cavity:Single Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Process Combination Type:Single-Process Mode
  • Application:Home Use

Base Info

  • Mould Operating Mode:Automatically by CNC
  • T1 Sample:50days
  • Mould Report:7-10days Per Time
  • Mould Design:7days
  • T1 Time:60days
  • Mould Quality Control:by Professional QC in House Control
  • Mould Cooling System:by Experienced Designer
  • Heat Treatment:Nitriding
  • Mould Base:S50c,C45
  • Customized:Customized
  • Standard:Dme,Hasco,Lkm Ect
  • Certification:ISO
  • Installation:Fixed
  • Design Software:Ug,Proe,CAD,Catia,Solid Works
  • Runner:Cold,Hot
  • Model NO.:JSL-T1771-4
  • Transport Package:Wooden Crate
  • Specification:Dme
  • Trademark:JSLMOULD
  • Origin:Taizhou, China
  • HS Code:8480719090
  • Production Capacity:500 Sets Molds,Year

Description

Product NamePlastic Injection Household Drawer MouldProduct materialPPCore&Cavity Steel718Steel hardnessHRC34-38Mould StandardDMECavity Number1Injection Systemdirect gateEjector Systemejector pinCycle Time30sTooling lead time60daysMould lifemore than 500,000shotsQuality assuranceISO9001 Our Advantage1.High quality2.Reasonable price3.On time delivery4.Good After-sale service5.Strict quality control6.All the mould are automotic. Offer youIn-time response on letters, telephone calls or faxIn-time supply the quotation and mould designsIn-time communication on the technical pointsIn-time sending pictures for the mould machining progress and mould finishing scheduleIn-time mould test and sample deliveryIn-time mould delivery.   
 For more information pls contact us.
 ProcessingTimePrepare Steel5 daysCNC Machining10 daysDrill8 daysHeat treatment6 daysHigh speed CNC Machining7 daysAssembling and Fitting6 daysPolishing6 daysT1 mould test2 da 1. Samples/Drawing & Requirement from you2. Mould design: we will Communicate& Exchange the opinion with you after you place order.3. Material Purchase: Steel cutting and Mould base tooling. 4. Assembling.5. Inspection of mould: following and controlling the tooling processing.6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you!7. Your instruction & confirmation for shipment.8. Ready made mould before packing.
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould
High Quality Experienced Plastic Drawer Box Mould