Mould

Plastic Drawer for Plastic Injection Drawer Mould

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.
  • Process Combination Type:Single-Process Mode
  • Plastic Material:PP
  • Mould Cavity:Single Cavity
  • Surface Finish Process:Polishing
  • Shaping Mode:Injection Mould
  • Application:Commodity, Home Use

Base Info

  • Mould Design Software:Ug,Proe,CAD,Catia,Solidworks
  • Mould Delivery Time:60 Days
  • Mould Life:More Than 500k Shots
  • Mould Steel:718 (34-38HRC)
  • Mould Name:Plastic Injection Drawer Mould
  • Customized:Customized
  • Standard:DME
  • Certification:ISO
  • Installation:Fixed
  • Design Software:UG
  • Runner:Cold Runner
  • Model NO.:JSL-F17711
  • Transport Package:Wooden Crate
  • Specification:Dme
  • Trademark:JSLMOULD
  • Origin:China
  • HS Code:8480719090
  • Production Capacity:500sets,Year

Description

Basic Info.

Model NO. JSL-F17711 Runner Cold Runner Design Software UG Installation Fixed Certification ISO Standard DME Customized Customized Mould Name Plastic Injection Drawer Mould Mould Steel 718 (34-38HRC) Mould Life More Than 500k Shots Mould Delivery Time 60 Days Mould Design Software Ug,Proe,CAD,Catia,Solidworks Transport Package Wooden Crate Specification Dme Trademark JSLMOULD Origin China HS Code 8480719090 Production Capacity 500sets/Year

Product Description

Product Name: Plastic injection drawer mould
Product material: PP
Core&Cavity Steel: 718
Steel hardness: HRC34-38
Mould Standard: DME
Injection System: Direct gate
Ejector System: Ejector plate

High quality, reasonable price
Good after-sale service
On time delivery

JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:

1. Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C

- design checking (part design, mould design, mould engineering drawing)

- checking each part of mould's size after machining, according to 2D drawing

- mould testing(check mould running condition)

3. Check with customer's requirement again before mould shipping.