
Plastic Chair Mould / Furniture Mould / Injection Mould
Taizhou Remo Plastic Mould Co., Ltd.- Plastic Material:PP
- Mould Cavity:Single Cavity
- Surface Finish Process:Polishing
- Shaping Mode:Injection Mould
- Process Combination Type:Progressive Die
- Application:Furniture
Base Info
- Sample Time:60 Days
- Polish System:Mirror Polish
- Approximate Mould Weight:5-6 Tons
- Changeable Back Inserts:Available
- Mould Life:300,000-500,000 Shots
- Cooling:Water Cooling
- Hot Runner Brand:Chinese Brand , International Brand
- Runner System:Hot Runner System
- Cavity Numbers:Single Cavity
- Name:Plastic Chair Mould
- Customized:Customized
- Standard:HASCO
- Installation:Semi Fixed
- Design Software:UG
- Runner:Hot Runner
- Model NO.:RMBM16-0160131
- Transport Package:Wooden Case
- Specification:SGS certified
- Trademark:REMO
- Origin:China
- HS Code:8410719090
- Production Capacity:25 Sets,Month
Description
Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step 1. R& D We support customer R& D. Make the files or improve the design if you needed ↓ ↓ ↓ 2. Quotation Making Mould Quotation will be finished in 1 day according to information we get ↓ ↓ ↓ 3. Negotiation The quality, price, material, delivery time. payment item. ect ↓ ↓ ↓ 4. Mould Design 3-5 days for mould and product 3D/2D drawing design ↓ ↓ ↓ 5. Mould According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days ↓ ↓ ↓ 6. Mould Testing When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. ↓ ↓ ↓ 7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory ↓ ↓ ↓ 8. Delivery Delivery goods by sea or by air, according customers requirement 


