72 Cavity Pet Preform Injection Plastic Mould with Pneumatice Valve Gate System Plastic ...
TAIZHOU HUANGYAN DAELONG MOLD CO., LTD.- Cavity Quantity:72
- Runner System:Hot Runner
- Gate Type:Pinpoint Gate
- Shaping Mode:Injection Mould
- Material:Steel
- Certification:CE
Base Info
- Transport Package:Wooden Package
- Pet Preform:Hot Runner
- Hot Runner:Pneumatice Valve Gate System
- Customized:Customized
- Model NO.:PET preform mould
- Specification:1560*700*800
- Trademark:NO logo
- Origin:China
- HS Code:84807190
Description
Other Specification of the MouldHot runner system Hot runner system is made by our own factory, But the spare parts of the Hot runner is from Germany Hotest PID controller Made by our own factory Guarantee for the Mould 1 million shot times of 1 year Free spare parts of the mould Core set : 1set/ cavity: 1 Piece/ hot runner system:1set/PID controller system: 1Set/ other easy broken spare parts for each 8cavities preform mould. The life of the mould 5-6years ,Even in 10 years in good maintenance Installation & Commission Our technician can be the buyer's factory to install and run the mould. But the buyer should bear all the cost for the technician's trip(include the air ticket, the cost of the accommodation and the salary) CONDITIONS:
TERMS OF PRICE: FOB NINGBO PRICE.
TERMS OF PAYMENT:30%THE TOTAL AMOUNT IN ADVANCE BY T/T. 70%THE BANLANCE BY L/C AT SIGHT OR BY T/T AFTER TEST AND ACCEPT THE MAHCINE AND MOULD IN THE SELLER'S FACTORY..
THE DATE OF DELIEVERY: 35-45 DAYS AFTER GETTING THE DEPOSIT.
THE PORT OF DELIEVERY: NINGBO,CHINA
PACKING: EXPORT STANDARD PACKING
TERMS OF PRICE: FOB NINGBO PRICE.
TERMS OF PAYMENT:30%THE TOTAL AMOUNT IN ADVANCE BY T/T. 70%THE BANLANCE BY L/C AT SIGHT OR BY T/T AFTER TEST AND ACCEPT THE MAHCINE AND MOULD IN THE SELLER'S FACTORY..
THE DATE OF DELIEVERY: 35-45 DAYS AFTER GETTING THE DEPOSIT.
THE PORT OF DELIEVERY: NINGBO,CHINA
PACKING: EXPORT STANDARD PACKING